Year Built
1956
CDS-Code
30-73643-6030696
Address
12712 Browning Ave, Santa Ana, CA 92705
Grade Level
TK-5th
Acreage
10
Total SF
35,470
Website
https://tustinmemorial.tustin.k12.ca.us/
Site Mission
Tustin Memorial Academy fosters the social-emotional well being, character, and high academic achievement of all students through strong family partnerships and engaging learning experiences. We are an inclusive community that celebrates the uniqueness of all individuals and develops kind, confident, curious learners and compassionate citizens.
Principal
Brooke Carreras
Existing & Proposed Site
![Existing](https://static.wixstatic.com/media/31a206_b5d6971bed2849bf805351e89c2cc140~mv2.jpg/v1/fill/w_980,h_980,al_c,q_85,usm_0.66_1.00_0.01,enc_avif,quality_auto/31a206_b5d6971bed2849bf805351e89c2cc140~mv2.jpg)
Existing
![Proposed](https://static.wixstatic.com/media/31a206_d4ebfce3563d466ca98b8f2521492baf~mv2.jpg/v1/fill/w_980,h_980,al_c,q_85,usm_0.66_1.00_0.01,enc_avif,quality_auto/31a206_d4ebfce3563d466ca98b8f2521492baf~mv2.jpg)
Proposed
![Existing](https://static.wixstatic.com/media/31a206_b5d6971bed2849bf805351e89c2cc140~mv2.jpg/v1/fill/w_980,h_980,al_c,q_85,usm_0.66_1.00_0.01,enc_avif,quality_auto/31a206_b5d6971bed2849bf805351e89c2cc140~mv2.jpg)
Existing
Completed Projects
PAST PROJECTS | YEAR |
---|---|
Summer Project – Slurry | 2016 |
Playground Replacement Project | 2016 |
Summer Project – Interior Painting All Buildings | 2019 |
Summer Project – Floor Replacement All Buildings | 2019 |
Summer Project – Slurry and Stripe – Playgrounds and Parking Lot | 2019 |
Solar Shade Structure Project | 2019 |
Playground Equipment and Re-surfacing Project | 2020 |
Summer Project – Asphalt Replacement | 2022 |
Summer Project – Asphalt under the Solar Structure | 2023 |